Plant Equipment Installation

Plant Equipment Installation

Back

What We Do

Our Approach

01

Turbine Installation

Precision installation of steam, gas, and hydro turbines including alignment, anchoring, and integrity verification.

02

Boilers and Heat Exchangers

Installation with associated piping, supports, and thermal insulation interfaces.

03

Generators and Transformers

Placement, alignment, and connection of high-voltage electrical generation equipment, including coordination with HV switchgear and circuit breakers.

04

Process Equipment Installation

Separators, distillation columns, reactors, and reaction vessels for refining and process operations.

05

Pumping and Compression Systems

Installation of pumping stations, compressors, and associated piping for fluid transport.

06

Sea Water and Treatment Plant Equipment

Large-scale water intake and treatment systems for power plants requiring cooling and process water supply.

07

Performance Testing

Comprehensive testing of installed equipment against operational efficiency and performance standards.

08

System Integration Testing

Verification of seamless operation across the integrated plant, including safety systems and emergency shutdown.

09

Safety Systems Integration

Installation and testing of fire detection, suppression, and emergency shutdown systems to ensure plant safety compliance.

10

Safety and Environmental Compliance

Installation and testing of safety and environmental protection systems to comply with industry standards and regulations.

Track Record

Where We've Delivered

Matarbari 2×600MW Coal Power Plant

Bangladesh

Power plant erection contractor scope covering all major mechanical and electromechanical systems.

  • Sea water intake erection
  • Water Treatment Plant and Wastewater Treatment Plant erection
  • ESP, FGD, and Ash Silo equipment erection
  • Steam Turbine erection
  • Auxiliary Boiler erection
  • Balance of Plant equipment erection
Toshiba Plant System & Services CorporationDec 2020 – Jan 2024

2×1000MW Jimah East Power Plant

Port Dickson

Plant equipment installation scope as part of the balance of plant works.

  • Steam Turbine erection
  • Deaerator installation
  • Overhead Crane installation
TPSC Engineering MalaysiaNov 2018 – Jan 2021

Standards & Compliance

Certifications & Codes

ISO 9001:2015

Quality Management for installation procedures

ASME, BS, and equipment-manufacturer-specific commissioning standards

Toshiba-recognised performance

Certificates of Appreciation for Matarbari steam turbine erection scope