Ductwork

Ductwork

Back

What We Do

Our Approach

01

High-Quality Fabrication

Using materials and welding procedures specified for harsh industrial conditions and corrosive gases.

02

On-site Installation

In coordination with ESP, FGD, and stack erection sequencing to ensure programme alignment and structural integration.

03

Protective Lining Application

Corrosion-resistant linings to prevent deterioration in aggressive gas environments and maintain duct structural integrity.

04

Thermal Insulation Linings

To reduce heat loss and maintain consistent internal duct temperatures across the system.

05

Wear-Resistant Coatings

To protect ductwork from abrasion and mechanical damage, extending system service life in high-velocity gas streams.

06

Comprehensive Flue Gas Duct Installation

From ESP through to stack, ensuring seamless integration with ESP, FGD, and existing plant systems.

07

Corrosion-Resistant Material Selection

Engineering selection of appropriate materials for high-temperature service in coal-fired and process plant environments.

08

Inspections and Maintenance

Regular inspections and prompt repairs to ensure integrity and performance of the discharge system.

Track Record

Where We've Delivered

Matarbari 2×600MW Coal Power Plant

5,000 tons
Bangladesh

5,000 tons of ESP hopper and flue gas duct fabrication; integration with ESP/FGD erection scope as a coordinated mechanical package.

Toshiba Plant System & Services CorporationDec 2021 – Dec 2023