Electrical & Instrumentation (E&I)
End-to-end electrical and instrumentation works for industrial plants — from HV/MV/LV power systems and substation erection to cable laying, panel installation, and fire protection.
What We Deliver
Trip Guard delivers integrated Electrical and Instrumentation (E&I) scope for industrial plants, power generation facilities, and oil and gas installations. Our E&I capability covers the full installation chain — from high-voltage power distribution and Gas Insulated Switchgear (GIS) erection through to cable laying, cable tray and conduit installation, panel and instrument fitting, and fire protection systems.
Our largest single E&I scope to date was delivered at the 2x600MW Matarbari Coal Power Plant in Bangladesh for Toshiba Plant System & Services Corporation — a multi-year campaign that included the installation of 97 transformers, 1,800 km of cable laying and termination, 890 tons of 400kV Gas Insulated Switchgear (GIS), 1,255 cabinets and panels, 6,244 instruments, 7,163 tons of cable tray and conduit, and 15 tons of bus duct.
HV / MV / LV Power Systems
High, medium, and low-voltage distribution networks for industrial and commercial use.
GIS & Substation Erection
Gas Insulated Switchgear erection up to 400kV class, substation construction, and switchyard works.
Cable Laying, Termination & Cable Trays
Power and instrumentation cable installation, termination, and supporting cable tray and conduit infrastructure.
Instrumentation, Cabinet & Panel Installation
Control panels, instrumentation cabinets, sensors, and field devices.
Fire Protection & Alarm Systems
Fire detection, alarm panels, smoke and heat detection, and suppression systems compliant with NFPA and BOMBA standards.
Explore Sub-Services
Detailed Capability Areas
Where We've Delivered
Matarbari 2×600MW Coal Power Plant
Dec 2021 – 2023Bangladesh
Trip Guard's largest single E&I scope — full plant electrical and instrumentation installation for Toshiba Plant System & Services Corporation.
- 97 transformer installations
- 890 tons of 400kV GIS erection
- 15 tons of bus duct
- 1,255 cabinet and panel installations
- 6,244 instrument installations
- 7,163 tons of cable tray and conduit
- 1,800 km of cable laying and termination
2×1000MW Jimah East Power Plant
Nov 2018 – Jan 2021Port Dickson
500kV switchgear installation, 500kV gantry structure erection, and cable dressing and termination work.
Certifications & Standards
Compliance & Credentials
Our work is underpinned by a rigorous commitment to quality, safety, and environmental responsibility. Every project we deliver meets or exceeds the applicable Malaysian and international standards, giving our clients confidence at every stage.
CIDB Malaysia Grade G7
Mechanical & Electrical (M15)
ISO 9001:2015, ISO 14001:2015, ISO 45001:2018
IEC, IEEE, and BS standards for electrical installation
NFPA 850, NFPA 805, NFPA 30, NFPA 72
fire protection (where applicable)
Malaysian BOMBA
UBBL 1984, MS 1745, MS 1183:2015 — fire protection systems