Electrical & Instrumentation (E&I)
Service 03

Electrical & Instrumentation (E&I)

Category Overview

What We Deliver

Trip Guard delivers integrated Electrical and Instrumentation (E&I) scope for industrial plants, power generation facilities, and oil and gas installations. Our E&I capability covers the full installation chain — from high-voltage power distribution and Gas Insulated Switchgear (GIS) erection through to cable laying, cable tray and conduit installation, panel and instrument fitting, and fire protection systems.

Our largest single E&I scope to date was delivered at the 2x600MW Matarbari Coal Power Plant in Bangladesh for Toshiba Plant System & Services Corporation — a multi-year campaign that included the installation of 97 transformers, 1,800 km of cable laying and termination, 890 tons of 400kV Gas Insulated Switchgear (GIS), 1,255 cabinets and panels, 6,244 instruments, 7,163 tons of cable tray and conduit, and 15 tons of bus duct.

01

HV / MV / LV Power Systems

High, medium, and low-voltage distribution networks for industrial and commercial use.

02

GIS & Substation Erection

Gas Insulated Switchgear erection up to 400kV class, substation construction, and switchyard works.

03

Cable Laying, Termination & Cable Trays

Power and instrumentation cable installation, termination, and supporting cable tray and conduit infrastructure.

04

Instrumentation, Cabinet & Panel Installation

Control panels, instrumentation cabinets, sensors, and field devices.

05

Fire Protection & Alarm Systems

Fire detection, alarm panels, smoke and heat detection, and suppression systems compliant with NFPA and BOMBA standards.

Industries We ServePower GenerationOil & GasPetrochemical ProcessingWater & Wastewater TreatmentManufacturing

Explore Sub-Services

Detailed Capability Areas

HV / MV / LV Power Systems

HV / MV / LV Power Systems

Trip Guard installs high, medium, and low-voltage (HV / MV / LV) power distribution systems for industrial plants, power generation facilities, and large commercial developments. Scope covers transformers, switchgear, bus ducts, and associated distribution equipment, integrated with cable tray, cable laying, and termination work for end-to-end power system delivery.

GIS & Substation Erection

GIS & Substation Erection

Trip Guard delivers Gas Insulated Switchgear (GIS) and substation erection for power plants and industrial facilities — covering high-voltage switchgear installation, gantry erection, transformer placement, and switchyard construction. Our largest delivery to date is the 890-ton 400kV GIS erection at the 2x600MW Matarbari Coal Power Plant in Bangladesh.

Cable Laying, Termination & Cable Trays

Cable Laying, Termination & Cable Trays

Trip Guard delivers high-volume cable laying, termination, and cable tray and conduit installation for power plants and industrial facilities. Our cable scope includes both power and instrumentation cabling, with the supporting cable tray and conduit infrastructure that holds it. The largest single cable campaign Trip Guard has delivered was 1,800 km of cable laying and termination supported by 7,163 tons of cable tray and conduit at the 2x600MW Matarbari Coal Power Plant.

Instrumentation, Cabinet & Panel Installation

Instrumentation, Cabinet & Panel Installation

Trip Guard installs instrumentation, control cabinets, and panels for industrial plant control systems. Our scope covers the placement, mounting, and connection of field instruments, control panels, MCC cabinets, and instrumentation enclosures, integrated with the broader E&I installation scope.

Fire Protection & Alarm Systems

Fire Protection & Alarm Systems

Trip Guard installs fire protection and alarm systems for industrial plants — including fire-fighting piping, fire detection (smoke and heat), alarm panels, and emergency suppression systems. Our scope complies with both international standards (NFPA codes) and Malaysian BOMBA requirements (UBBL 1984, MS 1745, MS 1183:2015).

Track Record

Where We've Delivered

Matarbari 2×600MW Coal Power Plant

Dec 2021 – 2023

Bangladesh

Trip Guard's largest single E&I scope — full plant electrical and instrumentation installation for Toshiba Plant System & Services Corporation.

  • 97 transformer installations
  • 890 tons of 400kV GIS erection
  • 15 tons of bus duct
  • 1,255 cabinet and panel installations
  • 6,244 instrument installations
  • 7,163 tons of cable tray and conduit
  • 1,800 km of cable laying and termination
Toshiba Plant System & Services Corporation

2×1000MW Jimah East Power Plant

Nov 2018 – Jan 2021

Port Dickson

500kV switchgear installation, 500kV gantry structure erection, and cable dressing and termination work.

TPSC Engineering Malaysia

Certifications & Standards

Compliance & Credentials

Our work is underpinned by a rigorous commitment to quality, safety, and environmental responsibility. Every project we deliver meets or exceeds the applicable Malaysian and international standards, giving our clients confidence at every stage.

CIDB Malaysia Grade G7

Mechanical & Electrical (M15)

ISO 9001:2015, ISO 14001:2015, ISO 45001:2018

IEC, IEEE, and BS standards for electrical installation

NFPA 850, NFPA 805, NFPA 30, NFPA 72

fire protection (where applicable)

Malaysian BOMBA

UBBL 1984, MS 1745, MS 1183:2015 — fire protection systems